With the development of global economic integration, the market competition faced by enterprises is becoming more and more fierce. In order to remain invincible in the cruel competition, the quality of products and services are particularly important. In this business environment, the application of dust-free workshops is becoming more and more extensive. When decorating a dust-free workshop, you must pay attention to relevant matters and requirements during construction in order to create a high-quality and qualified dust-free workshop project.
Generally speaking, the construction projects of decorating a dust-free workshop mainly include the installation of partition boards, ceilings, air-conditioning systems, floors, and lighting fixtures. Partition board projects, including windows and doors, are made of color steel plates, but there are many types of sandwich panels for color steel plates. The construction of the air-conditioning system includes the main unit, air ducts, filter systems, FFU, etc. When decorating a dust-free workshop, elevated floors or anti-static PVC floors and epoxy resin floors are used.
In the process of decorating a dust-free workshop, special attention should be paid to the construction requirements of electrical engineering. Among them, clean air conditioning power distribution, lighting power distribution and other equipment power distribution should be controlled separately. The network cable and the power supply of the wall equipment use the original lines, and the distribution box, sockets, lighting switches and network panels are all concealed. Cleanrooms should provide adequate lighting according to production requirements, and should be reviewed before construction. Each separate area lighting switch should be controlled separately, and indoor cleanroom lamps should be cleaned in time after installation.
Purification air conditioning construction is a very important part of decorating dust-free workshops. During construction, it should be noted that: the air ducts and components should be made of high-quality galvanized steel plates, the inner surface of the air duct must be flat and smooth, the air duct must not be reinforced in the pipe, the bite should be joint angle bite, and the joint must be coated with sealant. After the air duct is installed and before insulation, a leak check should be carried out. Before installing the high-efficiency filter, the clean room and the purification air conditioning system must be fully cleaned and scrubbed. After meeting the cleaning requirements, the purification air conditioning system is turned on for continuous trial operation for more than 12 hours, and then cleaned and scrubbed again. The clean room should be installed immediately with a high-efficiency filter. Precautions and requirements for the construction of the decoration of the dust-free workshop
With the development of global economic integration, the market competition faced by enterprises is becoming more and more fierce. In order to remain invincible in the cruel competition, product quality and service are particularly important. In this business environment, the application of dust-free workshops is becoming more and more widespread. When decorating a dust-free workshop, you must pay attention to relevant matters and requirements during construction in order to create a high-quality and qualified dust-free workshop project.
Requirements for decorating a dust-free workshop
Generally speaking, the construction projects for decorating a dust-free workshop mainly include the installation of partition boards, ceilings, air conditioning systems, floors, and lighting fixtures. Partition board projects, including windows and doors, are made of color steel plates, but there are many types of sandwich panels for color steel plates. The construction of the air conditioning system includes the main unit, air ducts, filter systems, FFU, etc. For decorating a dust-free workshop, elevated floors or anti-static PVC floors and epoxy resin floors are used.
During the decoration of a dust-free workshop, special attention should be paid to the construction requirements of electrical engineering. Among them, the power distribution of clean air conditioning, lighting, and other equipment should be controlled separately. The power supply of network cables and wall equipment uses the original lines, and the distribution boxes, sockets, lighting switches, and network panels are all concealed. The clean room should provide sufficient lighting according to production requirements, and a review should be conducted before construction. The lighting switches in each separate area should be controlled separately, and the indoor clean lighting fixtures should be cleaned in time after installation.
The construction of purification air conditioners is a very important part of decorating a dust-free workshop. During construction, attention should be paid to the following: the air duct and components should be made of high-quality galvanized steel plates, the inner surface of the air duct must be flat and smooth, the air duct shall not be reinforced inside the pipe, the joint should be jointed with a joint, and the joint must be coated with sealant. After the air duct is installed and before insulation, an air leakage check should be carried out. Before installing the high-efficiency filter, the clean room and the purification air conditioning system must be fully cleaned and scrubbed. After meeting the cleaning requirements, the purification air conditioning system should be turned on for continuous trial operation for more than 12 hours, and then the clean room should be cleaned and scrubbed again, and the high-efficiency filter should be installed immediately.